Requirements for Developers and Contractors
The NPDES permit requires the City to implement specific requirements to control pollution of runoff from development and construction projects. This applies to sites where activities such as clearing, grading, excavation, road construction, structure construction or structure demolition results in the disturbance of soil.
- Requirements for Construction Projects with One Acre or Greater of Disturbed Soil
Projects will require a General Construction Activities Stormwater Permit from the State Water Resources Control Board
more